PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Electric conduit at Elev. 5,6 Facing West (800x600).jpg Excavation for the trench drain rebar boxes Facing West (800x600).jpg Pour concrete at Column C-1 Facing South (800x600).jpg Pour concrete at column D-1 Facing South  (800x600).jpg Pour concrete at Stair -2 slab Facing West  (800x600).jpg Pour concrete at Stair -4 slab Facing East (800x600).jpg Started installing steel angles around Derrick -7 (2nd Floor) Facing North-West (800x600).jpg Built rebar boxes at trench drains (Room 141) Facing West (800x600).jpg Built rebar boxes at trench drains (Room 142) Facing West  (800x600).jpg
Previous pageNext page Pour concrete at Stair -2 slab Facing West  (800x600)
Pour concrete at Stair -2 slab Facing West (800x600)